INDIGO NAGAR PROJECT

INDIGO NAGAR is pinpointed at Naduveerapattu, near Tambaram and is in close proximity to Kishkinta amusement park, Sairam engineering college within CMDA limits surrounded by greens all around to escape the concrete mound of hectic cityscapes.

These exclusive Independent Duplex villas of 2BHK / 3BHK at Indigo nagar will fulfill all your dreams of having a villa in lush green healthy environment with natural light and ventilation. A villa where you can relax with your family and make your own garden and also terrace garden.Weave happiness and memories that you can cherish a lifetime.

  • Close to Outer Ring Road
  • Kilambakkam Bus terminus
  • Thirumudivakkam SIPCOT
  • Shriram Gateway IT Park
  • vandalur zoo

Institutions

  • R.C.M School
  • Sai Ram Engineering College
  • Dhanlakshmi Engineering College
  • Lord’s International School
  • SAN Academy
  • Good Earth International School

Structure

  • RCC Framed Structure as per IS Standrad
  • Conventional Brick Walls

Floor Finish

  • 2’X2′ Vitrified tiles
  • Anti skid Ceramic tiles upto7ft Height in Bathrooms

Doors & Windows

  • Main door-Teak wood frame & Panel Door
  • Bedrooms and Balcony-Flush/Panel Doors With Paint Finish
  • Bathrooms-Flush Doors
  • UPVC Windows

Kitchen

  • Polished Black Granite counter top with granite sink
  • Glazed ceramic Tiles dadoo for 2′ Height

Sanitary

  • Parryware or equivalent Bath fittings
  • Parryware or equivalent sanitary fittings

Painting

  • Premium Emulsion with putty finish for interiors
  • ACE Paint finish for exteriors
  • Varnish for main doors
  • Enamel paint for window grills

Electrical

  • 3 Phase Electricity Connection
  • Metal switch Box/Modular Switch
  • Inverter compliant wiring
  • Electrical Switch Points and wiring will be done as per electrical drawing
    • Independent Borewell, Sump,Septic Tank and Compound Wall.
    • RCC Over Head Tank.
    • Space for Garden
    Sl.No Descritption Stage wise Percentage
    1 Villa Booking-Sale Agreement 10%
    2 Plot  registration 40%
    3 completion of basement 10%
    4 completion of  Ground Floor roof 10%
    5 completion of  First Floor roof 10%
    6 completion  of Ground Floor Brick work 5%
    7 completion  of First Floor Brick work 5%
    8 completion of plastering work 5%
    9 completion of Tiles,Compound wall,and Painting work 5%
    Total 100%